Home / Markets / Indonesia

Asia

Indonesia

Indonesia has a large and growing manufacturing base, and import requirements include a registration step that has to be settled before shipment. The spread between established industrial estates and remote sites makes charging infrastructure a site-by-site question.

Direct answer

For Indonesia, confirm the pre-shipment registration requirement for your machine category, because it affects the timeline and the supplier’s preparation. Electrical supply is standard 230 V 50 Hz. If the site is outside an established industrial estate, confirm the charging capacity available rather than assuming it.

Grid and supply conditions

Indonesia

Voltage, frequency and plug type drive the charger and motor specification, so they come first.

Voltage

230 V

Frequency

50 Hz

Plug type

Type C / F

Standard 230 V 50 Hz supply. Industrial estates generally provide stable supply; remote sites may not.

Questions to put to your customs broker

Questions to put to your customs broker

This page does not publish duty rates or documentation conclusions — those follow the HS code, origin and current trade measures. Confirm each item below with your broker.

  • What is the SNI or registration requirement for this equipment category?
  • Which HS code applies and what duty and VAT follow?
  • Is a pre-shipment inspection required, and by whom?
  • What does your importer licence permit you to bring in?
Logistics and packing notes

Logistics and packing notes

  • Tanjung Priok (Jakarta) and Tanjung Perak (Surabaya) are the main ports
  • Confirm charging capacity at the site, especially outside industrial estates
  • Inter-island delivery to Sulawesi, Kalimantan or Sumatra should be planned separately
How purchasing goes wrong in this market

How purchasing goes wrong in this market

Leaving the registration requirement until the goods have shipped

Assuming charging infrastructure exists at a remote site

Underestimating inter-island transport cost

Shipping into this market?

Tell us the destination, quantity and duty cycle. We will flag what you need to settle locally, then quote comparable routes on one configuration.